PREFABRICATION ALLOWS GREAT QUALITY-CONTROL OF THE PRODUCT AT YOUR FACILITY AND ENSURES THAT IT’S BEING DELIVERED TO THE JOB SITE READY TO BE INSTALLED WITHOUT MODIFICATION.
WIRE BUNDLING / CABLE ASSEMBLY | PROJECT KITTING
DESIGN
ASSEMBLY
DELIVERY
INSTALLATION
WHY PREFAB?
There are several factors for prefabrication, all of them are to reduce the overall cost and time of project delivery while increasing the quality and controlling scope.
SCHEDULE REDUCTION
RISK MITIGATION
SUPERIOR QUALITY
Schedule Reduction:
Prefabrication of critical path items leads to schedule reduction. Schedule management of critical path components such as MEP systems increases the certainty of outcome. PREFAB will reduce TIME & SCHEDULE and eliminate days off of your schedule.
Risk Management:
Critical path components are some of the most complex pieces of the building. Simplifying the complex through prefabrication mitigates risk in safety by reducing overhead work and site congestion.
Superior Quality Products:
Breaking the most complex components of the project into prefabricated pieces requires intensive coordination and enhanced virtual design and construction processed. Designers and builders must work through a level of detail not found in most construction documents. This process ensures a high level of quality that is consistent throughout the entire project.